Contractors are invited to submit sealed bids for guardrail repair in Putnam County. The work includes replacement and realignment of guardrail components at 32 locations, adhering to current FDOT standards. A mandatory prebid meeting is scheduled for September 2, 2026. Bids must be received by 2:00 p. m. EST on September 28, 2026. The award is based on the lowest and best proposal. Payment will be made after services are received and comply with specifications. Performance and payment bonds are required.
Bids must be delivered before 2:00 p. m. EST on **** due date and time to be considered responsive, bidders shall deliver before 2:00 p. m. est. on ****
Payment will be made by the county after the services have been received, and found to comply with the specifications, and have been properly invoiced. Payment will be made by the county after the services have been received, and found to comply with the specifications, and have been properly invoiced.
The basis for bid award is to the lowest and best proposal for solicited services which meets or exceeds the conditions of the bid specifications. the basis for bid award, if awarded, is to the lowest and best proposal for solicited services which meets or exceeds the conditions of the bid specifications
Bidders must have successfully constructed at least two projects of the type proposed and been in business for at least three years. bidders must have successfully constructed, as a prime contractor or subcontractor, at least two 2 projects of the type construction proposed for this project, and must have been in business as a contractor for at least three3 years
Failure to complete the work on time shall constitute a material breach of the agreement. time is of the essence of this agreement, and failure to complete the work on time shall constitute a material breach of the agreement
A mandatory prebid meeting is held on Wednesday, September 2, 2026. there will be a mandatory prebid meeting held at 11: 00 a. m. , wednesday, september 2, 2026
Sample submission is required, and the contractor must submit all required samples with promptness. The term samples as used herein included natural materials, fabricated items, equipment, devices, appliances, or parts thereof as called for in the specifications, and any other samples as may be required by the engineer to determine whether the kind, quality, construction, workmanship, finish, color, and other characteristics of the materials, etc. , proposed by the contractor conform to the requirements of the contract documents.
Written questions must be received at least 7 days prior to bid opening. Questions must be received at least 7 days prior to bid opening.
Failure to abide by the cone of silence policy is grounds for disqualification. failure to abide by the cone of silence policy is grounds for disqualification from this solicitation process