Commonwealth Of Kentucky - Facilities & Support Services- KY
RFB- 273- 26 DOC WKCC Multi Building Roof Replacement
Bid Close Date:
Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** This project consists of 5 separate buildings. Scope of work includes the existing shingle removal down to deck and installation of new metal panel roof system of 3 roofs ( A, C & E), flute fill and PVC overlay of 1 roof ( D), removal and replacement of 1 awning and the demolition of 1 canopy ( J). BUILDINGS A, C & E 1. tRemove existing roofing and underlayment to decking of 3 separate structures ( A, C& E). 2. tRemove & replace any damaged /deteriorated roof decking of roofs. 3. tRemove existing gutters and downspouts on all buildings. 4. tInstall new ice and water shield at perimeters and penetrations of roofs. 5. tInstall new underlayment, metal roof panels and components on all roofs. 6. tInstall new gutters, downspouts, valleys and trim where indicated on drawings. Building D 1. tNew PVC roofing membrane & flute filler rigid insulation installed over existing metal panel roof systems. a. tClean roof surfaces b. tLoose lay rigid Isocyanate insulation between roof panel ribs c. tLoose lay HD Iso cover board insulation over entire roof d. tMechanically fasten both layers of insulation to existing metal roof structure. e. tMechanically attach . 060 PVC membrane roof over insulation. f. tInstall all PVC flashings and metal components to complete the installation. g. tInstall new pre- finished gutters and downspouts. BUILDING J 1. tDemoli