University Of Northern Iowa
Gilchrist Hall Dry Cooler Replacement The project consists of but is not limited to: replacing the existing dry cooler system on the roof to include the dry cooler, pump package, expansion tank, and piping. Add steel framing to existing curb. A new dry cooler, pump package, expansion tank, valves, and piping will be installed. New insulation with jacketing will be included. Electrical work includes demolition of existing power distribution to old equipment and installing new power to equipment. Dry cooler c
Bid Close Date: