The tender outlines the requirements for the demolition of
Building 195 at the Norfolk Naval Shipyard, including construction waste management, recycling, reuse, and disposal of materials. The tender specifies the need for a construction waste management plan, source separation, handling, recycling, salvage, reuse, and return methods, transportation of recyclable materials, reuse of materials, recycling of nonhazardous materials, and disposal of waste materials. Closeout submittals, including as-built drawings and record drawings, are required. A warranty management plan is also required, including roles and responsibilities, guarantors, warranty certificates, warranted equipment list, and warranty period. GIS data deliverables are required, including data collection, attribute data requirements, GIS topology rules, and coordinate system requirements. The tender also specifies the need for a fire prevention program (FPP) plan, including pre-incident plans, emergency contacts, site emergency communication procedures, site personnel responsibilities during an incident, hot work operations, fire protection systems, temporary utilities, and a fire department status board. The tender also mentions the need to comply with sustainability requirements, stormwater management, and accessibility requirements. The tender includes specific requirements for handling hazardous materials, groundwater contamination, and protection of existing structures and equipment.