Dasny - Dormitory Authority Of The State Of New York - NY
CUNY Medgar Evers College AB1 Domestic Hot Water System Upgrade and AsbestosAbatement ( EOI: For Minority and Women- Owned Business Concerns only)
Domestic hot water system upgrade and asbestos abatement Removal of two dual fuel gas and 2 fuel oil domestic hot water tanks and associated valves, fittings, and appurtenances. Removal of associated piping for cold water, domestic water, hot water supply, gas, fuel oil, breeching, and drains. Removal of all electrical wiring and conduits from the equipment. Removal of three circulating pumps, an existing mixing valve, and associated piping. Partial removal of the existing shaft from the basement to the 6th floor. Installation of new 15 ton air source heat pumps at the roof level. Installation of two new hot water heaters, including circulation pumps and associated aquastat, mixing valve, cold and hot water piping, and heat tracing.
Bid Close Date: