USA | LA | CALCASIEU COUNTY | LAKE CHARLES | 70615
Small City
Calcasieu Parish School Board - LA
Spray Foam Insulation/ Thermal Insulation/ Spray Foam Insulation Applicators
folder DeQuincy High Gym
Building insulation, weatherization and building wrap for new gymnasium building Exterior wall cavity insulation, interior wall cavity insulation, ceiling cavity insulation, platform cavity insulation, attic insulation, sealants and caulking, building wrap, vapor retarder, seam tape, patch tape, flexible self- adhering flashings, liquid- applied membrane flashings, expanding spray foam, non- expanding spray foam, closed- cell polyurethane sprayed foam insulation, thermal/ignition barrier, fiberglass batt insulation, fiberglass blowing insulation, acoustical batt insulation
AI helper
Procurement for building insulation, weatherization, and building wrap for a new gymnasium at Dequincy High School for the Calcasieu Parish School Board. Includes fiberglass batt insulation, closed-cell spray foam insulation, building wrap, vapor retarder, sealants, and caulking. Requires 10-year weathertightness warranty from building wrap manufacturer. Mandatory at least 3 onsite inspections by manufacturer's technical field representative. Substitutions for spray foam require prior approval submitted at least 10 days before bid date. All work by manufacturer-certified applicators with minimum 2 years experience.
The building wrap manufacturer shall include and issue, at no additional cost to the owner, a written 10-year weathertightness warranty, guaranteeing that the building wrap system will protect the building from liquid water or water vapor intrusion.
Applicator shall have a minimum of two years experience installing similar systems, and shall provide a list of 10 projects similar in scope to the architect or the owners representative, upon request.
Requests for substitution must be submitted with supporting documentation no later than 10 days prior to bid date.
Requests received later than 10 days prior to bid date, or without the necessary supporting documentation to verify the proposed product is equal or superior to that specified will not be considered.