Cross Valley Water District - WA
Blowoff Assembly/ Airvac Assembly
2025 Water Main and PRV Improvements, Cross Valley Water District, Snohomish, WA # W- 2025- 01 - 2025 Water Main and PRV Improvements - The project consists of five different project sites in unincorporated Snohomish County, designated as Schedules A- E. The work for all five sites is to be done as part of the project and they are to be bid together as one project. Schedule A includes the installation of approximately 635 lineal feet of 4- inch diameter ductile iron ( DI) water main in 78th Street SE from 7
Water main and PRV improvements Schedule A: Installation of 635 lineal feet of 4- inch diameter ductile iron ( DI) water main in 78th Street SE, including new water services, one blowoff assembly, one airvac assembly, and one connection to the existing system. Schedule B: Installation of 325 lineal feet of 4- inch diameter DI water main in 79th Ave SE, including new water service lines, airvac and blowoff assemblies, and one connection to the existing system. Schedule C: Installation of 430 lineal feet of 4- inch diameter DI water main in a private drive south of 212th Street SE, including new water service lines, a blowoff assembly, and one connection to the existing system. Work for Schedules A & C also includes pavement sawcutting, trench patching, grind overlay, and gravel road and shoulder restoration. Schedule D: Upgrade of an existing pressurized reducing valve ( PRV) station at 88th Ave SE and 192nd Street SE, involving replacement of vault top section and installation of a sump ejector assembly. Sche
Bid Close Date: