City Of Key West - FL
Stormwater Pump Station/ Injection Well
Patricia & Ashby Stormwater Pump Station: 2nd Injection Well - The project consists of permitting and construction of a 2nd stormwater injection well at an existing stormwater pump station; installing well casing and well head piping with air valve in manhole; remove and replace two 24â isolating plug valves in new concrete vaults; new 24â spool and other connection piping, and surface restoration to include asphalt pavement, unimproved shoulder, and concrete sidewalk. Work includes all labor, materials,
Stormwater injection well construction Permitting and construction of a 2nd stormwater injection well at an existing stormwater pump station; installing well casing and well head piping with air valve in manhole; remove and replace two 24 isolating plug valves in new concrete vaults; new 24 spool and other connection piping, and surface restoration to include asphalt pavement, unimproved shoulder, and concrete sidewalk.