This is a Request for Quotation (RFQ) for a brand name only Thermo Scientific Attune NXT flow cytometer and Cytkick Max autosampler, along with three years of maintenance agreements. The system must have four excitation lasers (blue, red, violet, yellow) and be installed at NIST in Gaithersburg, MD. The contractor must provide a firm fixed price quotation. Quotations must be submitted via email to ***@***. *. * by 9:00 am Eastern Time on September 25, 2026. The system requires a minimum one-year warranty covering parts, labor, and travel. Delivery is F. O. B. destination within 120 calendar days of award.
Delivery shall occur within 120 calendar days of award. delivery shall be f. o. b destination and shall occur within 120 calendar days of award.
Payment shall be made for items accepted by the government that have been delivered to the delivery destinations set forth in this contract. payment shall be made for items accepted by the government that have beendelivered to the delivery destinations set forth in this contract.
The contractor shall provide, at a minimum, a one year warranty for the equipment. the contractor shall provide, at a minimum, a one year warranty for the equipment.
Award shall be made to the responsible quoter whose quotation, conforming to the solicitation, is the lowest priced, technically acceptable quote. award shall be made to the responsible quoter whose quotation, conforming to the solicitation, is the lowest priced, technically acceptable quote.
The contractor shall provide original equipment manufacturer oem certified and/or trained engineers and/or service technicians to perform equipment maintenance and repairs. the contractor shall provide original equipment manufacturer oem certified and/or trainedengineers and/or service technicians to perform equipment maintenance and repairs.
A quoters failure to address any factor may be considered indicative of the quoters lack of understanding of the governments requirements and may result in the offer being determined unacceptable. a quoters failure to address any factor may be considered indicative of the quoters lack of understanding of the governments requirements and may result in the offer being determined unacceptable.