USA | CO | PETERSON AFB
Cybersecurity Services/ Application Development Support Services/ Engineering Services
Continued sustainment and enhancement of the Nuclear Command, Control, and Communications ( NC3) Missile Warning and Legacy Space Command ( LSC2) missions. Contractor personnel shall have a secure, reliable System Integration Lab ( SIL/SCIF) - The services described herein are for the continued sustainment and enhancement of the Nuclear Command, Control, and Communications ( NC3) Missile Warning and Legacy Space Command ( LSC2) missions. This requires contractor personnel to h
Continued sustainment and enhancement of nuclear command, control, and communications ( NC3) missile warning and legacy space command ( LSC2) missions, including SCIF management and oversight services for a systems integration lab SCIF management and oversight services, systems integration laboratory ( SIL) operations, classified engineering development support up to Secret level, cybersecurity updates deployment, synthetic model ingestion and replay, system enhancements
AI helper
Sole source contract to Amentum Technology Inc. for SCIF management and oversight services supporting a systems integration lab for NC3 missile warning and LSC2 missions. Four-year contract with one base year (26 Dec 2026 - 25 Dec 2027) and three option years. Facility must be DCSA accredited with active ATC and ATO for NIIDE connection by 26 Dec 2026. Services support classified engineering development up to Secret level. Justification based on only one responsible source due to existing ATO and timeline constraints.
The SIL/SCIF services must be fully operational no later than 26 December 2026. As stated: must be fully operational no later than 26 december 2026 to prevent a gap in mission support.
Contractor must have a fully accredited SCIF with active ATC and ATO for NIIDE connection. As stated: the contractor currently operates a fully accredited silscif with the necessary atc and an active ato for the niide system connection.
Failure to have an active ATO by the required date would create an unacceptable gap. As stated: any other contractor would need to establish, accredit, and obtain an ato for a new facility. . . this timeline does not meet the governments need.