Dept Of Defense- Dept Of The Army- Amc- Acc- Mission & Installation Contracting Command- 419Th Csb- W6Qm Micc- Ft Drum
Granular Fill
Gravel and Sand Clay - Gravel and Sand Clay
Bid Close Date:
Government bid alerts, regional filters, and fast access to documents
Granular Fill
Gravel and Sand Clay - Gravel and Sand Clay
Bid Close Date:
Eq Rental Offset Drill w/Operator D- 9 - Federal
Bid Close Date:
Lot 5: Perform excavation as the slide repair dictates or as directed by the Engineer. Excavate each slide repair area to provide a platform for drilling the used railroad rails, if necessary. Excavate material as directed by the engineer wide enough to place cribbing and enough area for granular backfill. Equipment shall be capable of excavating a vertical trench to install cribbing up to 16 feet in depth from the roadway elevation. Method of excavation shall limit the damage or removal of the existing roadway pavement as much as possible. Excavating equipment bucket size and width shall be adjusted as directed by the engineer to achieve the excavation without damaging the pavement, utilities, drill steel, etc. Do not use excavated material from the site as fill material. If directed by the Engineer, additional excavation may be required to remove slide material from the roadway in order to maintain traffic or to eliminate the pavement break for future asphalt paving. Unless directed by the Engineer, excess excavation may be wasted at sites on the right- of- way, only if approved by the Engineer. Material may not be wasted in flood prone areas or in streams. If the Engineer deems no suitable sites are available within the right- of- way, the contractor will be required to waste excess material off the right- of- way at sites obtained by the contractor at no cost to the KY Dept. of Transportation. Excavation will be paid by field measurement.
Lot 1: See Specifications Section 1. 00 ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. See attached document How to Respond to an Online Bid through the Kentucky Vendor Self Service site ( updated). pdf. Please enter contact person, phone number and email in the Comments Section. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
Lot 2: Vendor supplied traffic control for drilled railroad rail drilling operation; Vendor shall provide flagging when requested. If Department provides traffic control, the flagging line item will not be included on the individual Delivery Order for Offset Drill with Operator. Item includes the appropriate number of flaggers for traffic control on the worksite. Each flagger will be paid at the hourly rate. With permission from the Engineer, the vendor may elect to use temporary traffic signals or portable traffic signals with appropriate signing in accordance with MUTCD or as directed by the Engineer. Vendor must also place and maintain appropriate work zone signing, flagger signs, flagger paddles, etc. in accordance with the MUTCD or as directed by the Engineer. Flagmen are required to wear appropriate safety equipment and must stay in constant communication with one another. Flaggers must work in accordance with Kentucky Dept of Highways Standard Drawings, in accordance with the MUTCD, and comply with Section 112 of the current Standard Specifications for Road and Bridge Construction at all times. Lane closures will only be permitted during daytime hours unless approved by the engineer. Payment will be made for the total number of man- hours worked for supplied traffic control each day. If vendor supplies portable traffic signals, payment by the man- hour will be based on number of man- hours flaggers would have been utilized instead of portable signals.
Lot 3: Vendor to provide used railroad rail. To be completed as stated in the extended description line 1 with the vendor providing the necessary used railroad rail. Use recycled ( used) railroad rails classified with a nominal weight of 130 lb/yd ( pounds per yard) size or greater. Use only visibly straight recycled rails with no splices. The Engineer will verify rail nominal weights ( manufacturer' s stamp with lb/yd, date, etc. ). Provide certification for nominal weight if the manufacturer' s stamp is unidentifiable.
Lot 4: Vendor to install cribbing at slide location as directed by the Engineer. Extend wall cribbing 2 feet to 16 feet as directed by Engineer below the existing ground line. If bedded rock is encountered, install the cribbing to the bedded rock only. The engineer will direct changes if necessary to the procedure. Vendor to furnish all labor and equipment to deliver and install wall cribbing on the recycled ( used) railroad rail piling. Wall cribbing shall be lapped, bolted, and attached solid to the drilled railroad rails. Use wall cribbing: recycled ( used) steel " w" beam guardrail shall be supplied by the KY Dept. of Transportation. Bolts, tie wire, welding, etc. needed to make the cribbing panels and attach to the drilled railroad rails will be furnished by the vendor. The Vendor is responsible for picking up the ( used) steel " W" beam guardrail at the local county Maintenance garage. Any unused ( used) steel " W" beam guardrail shall be returned to the maintenance garage by the vendor.
Lot 5: Perform excavation as the slide repair dictates or as directed by the Engineer. Excavate each slide repair area to provide a platform for drilling the used railroad rails, if necessary. Excavate material as directed by the engineer wide enough to place cribbing and enough area for granular backfill. Equipment shall be capable of excavating a vertical trench to install cribbing up to 16 feet in depth from the roadway elevation. Method of excavation shall limit the damage or removal of the existing roadway pavement as much as possible. Excavating equipment bucket size and width shall be adjusted as directed by the engineer to achieve the excavation without damaging the pavement, utilities, drill steel, etc. Do not use excavated material from the site as fill material. If directed by the Engineer, additional excavation may be required to remove slide material from the roadway in order to maintain traffic or to eliminate the pavement break for future asphalt paving. Unless directed by the Engineer, excess excavation may be wasted at sites on the right- of- way, only if approved by the Engineer. Material may not be wasted in flood prone areas or in streams. If the Engineer deems no suitable sites are available within the right- of- way, the contractor will be required to waste excess material off the right- of- way at sites obtained by the contractor at no cost to the KY Dept. of Transportation. Excavation will be paid by field measurement.
Lot 6: Vendor to furnish backfill material. Place Geotextile fabric as directed by the engineer, the geotextile fabric shall be lapped as outlined by the manufacture recommendations and Kentucky Standard Specifications. The geotextile fabric shall wrap the granular backfill to provide separation from all earth embankment. Construct granular embankment behind railroad rails, cribbing and on slope, as per Section 206 of the Kentucky Standard Specifications for Road and Bridge Construction, Current Edition. Backfill material shall be placed and compacted to eliminate voids. Construct embankment up to the approximate existing pavement elevation. Use the following backfill materials: Kentucky aggregate gradation no. 2' s /23' s or larger to the bottom of pavement elevation and place DGA Base from the bottom of the pavement elevation to the top of the existing pavement separated with Geotextile fabric as directed by the engineer. Backfill material shall meet requirements of Section 805 of the Kentucky Standard Specifications for Road and Bridge Construction, Current Edition. Backfill material delivered to the project, will only be accepted with a certified weigh ticket. A conversion factor of 1. 3 tons per cubic yard will be used to pay for all gradations of aggregate Backfill material delivered to the project. The Engineer will use visual inspection and/or material testing, as applicable to determine acceptability. Geotextile fabric shall be provided by the vendor. Vendor to furnish backfill material and labor to install geotextile fabric.
Lot 7: Vendor furnished laborer to trim tree limbs, extend Department furnished culvert pipe through crib wall, and taking down guardrail and stacking for the Department to pick up. The Department will be responsible for picking guardrail up and delivering to maintenance facility.
Lot 8: Vendor furnished bucket truck with operator capable of clearing tree limbs for a 40 feet drill mast. Vendor operator must be properly trained for the bucket truck operations and wear the appropriate safety equipment.
Lot 9: Vendor is to furnish and Install TY IV filter fabric for separation of the Backfill Material and Roadway Material. Payment per SQYD will include all labor, materials, and incidentals necessary to correctly install filter fabric in the slide area.
Lot 10: Vendor to furnish and install cribbing at slide location as directed by the Engineer. Vendor furnished cribbing must be galvanized guardrail, reinforced concrete panels, or equivalent material as approved by the engineer. The cribbing material must be corrosion resistant and be capable of holding backfill material across a span of 3 to 4 feet. Extend wall cribbing 2 feet to 16 feet as directed by Engineer below the existing ground line. If bedded rock is encountered, install the cribbing to the bedded rock only. The engineer will direct changes if necessary to the procedure. Vendor to furnish all labor and equipment to deliver and install wall cribbing on the recycled ( used) railroad rail piling. Wall cribbing shall be lapped, bolted, and attached solid to the drilled railroad rails. Bolts, tie wire, welding, etc. needed to make the cribbing panels and attaching to the drilled railroad rails will be furnished by the vendor.
Lot 11: Vendor furnished cribbing material must be galvanized guardrail. The guardrail shall be delivered and paid in 12. 5 LF sections. 25 LF guardrail sections will be considered /accepted upon the engineer' s approval. The guardrail material must be corrosion resistant, hole punched as shown for standard guardrail installation, and straight. KYTC will unload the material. Minimum order of 5, 625 Sq. Ft. MODIFIED ROTARY DRILL WITH OPERATOR( S). DRILL TO BE TRUCK MOUNTED AND CAPABILITY OF DRILLING 7" TO 10" DIAMETER HOLES 40 FEET INTO SOIL AND ROCK. ROTARY DRILL MUST HAVE CAPACITY OF DRILLING OFFSET A MINIMUM OF FIVE ( 5) FEET FROM THE EDGE OF THE TIRE TO THE CENTER OF THE HOLES, DRILLING FROM EITHER SIDE OF THE CARRIER AND ON A 15% SLOPE. MAST JIB SHALL BE ABLE TO LIFT AND DROP INTO THE HOLES, STEEL RAILROAD RAILS UP TO 40 FEET IN LENGTH AND WEIGHING UP TO 2, 000 POUNDS. DRILL SHALL HAVE A MINIMUM 150 H. P. MOTOR AND AT LEAST A 300 CFM COMPRESSOR CAPABLE OF 16, 000 POUNDS OF PULL DOWN PRESSURE. PAYMENT WILL BE MADE ON THE PART OF THE RAIL THAT IS SATISFACTORILY PLACE BELOW GROUND LEVEL. NO PAYMENT WILL BE MADE FOR THE PART OF THE RAIL EXTENDING ABOVE THE HOLE. CONTRACTOR IS RESPONSIBLE FOR CUTTING ANY RAILROAD STEEL THAT IS NOT FLUSH WITH THE ESTIMATED FINISHED SHOULDER AFTER BEING DROPPED INTO DRILLED HOLES. CONTRACTOR MUST BE ABLE TO DRILL AND INSTALL 800 FT OF RAILROAD STEEL PER 8 HOUR WORKDAY. LEEWAY WILL BE GIVEN FOR WEATHER AND UNFORSEEN CIRCUMSTANCES AT THE DEPARTMENTS DISCRETION. THE TRANSPORTATION CABINET SHALL PROVIDE RAILROAD RAILS, MAKE NECESSARY SITE PREPARATION AND FURNISH NECESSARY TRAFFIC CONTROL.
Lot 12: Modified rotary drill with operator( s). Drill to be truck mounted and capability of drilling 7" to 10" diameter holes 40 feet into soil and rock. Rotary drill must have capacity of drilling offset a minimum of five ( 5) feet from the edge of the tire to the center of the holes, drilling from either side of the carrier and on a 15% slope. Mast jib shall be able to lift and drop into the holes, steel railroad rails up to 40 feet in length and weighing up to 2, 000 pounds. Drill shall have a minimum 150 h. P. Motor and at least a 300 cfm compressor capable of 16, 000 pounds of pull down pressure. Payment will be made on the part of the rail that is satisfactorily place below ground level. No payment will be made for the part of the rail extending above the hole. Contractor is responsible for cutting any railroad steel that is not flush with the estimated finished shoulder after being dropped into drilled holes. Contractor must be able to drill and install 800 ft of railroad steel per 8 hour workday. Leeway will be given for weather and unforseen circumstances at the departments discretion. The transportation cabinet shall provide railroad rails, make necessary site preparation and furnish necessary traffic control.
Lot 13: Vendor to provide used railroad rail. This includes drilling the hole, providing and placing the rail. Use only visibly straight recycled rails with no splices. The Engineer will verify rail nominal weights ( manufacturer' s stamp with lb/yd, date, etc. ). Provide certification for nominal weight if the manufacturer' s stamp is unidentifiable. This line item shall be used for all work paid using FEDERAL funds. MODIFIED ROTARY DRILL WITH OPERATOR( S). DRILL TO BE TRUCK MOUNTED AND CAPABILITY OF DRILLING 7" TO 10" DIAMETER HOLES 40 FEET INTO SOIL AND ROCK. ROTARY DRILL MUST HAVE CAPACITY OF DRILLING OFFSET A MINIMUM OF FIVE ( 5) FEET FROM THE EDGE OF THE TIRE TO THE CENTER OF THE HOLES, DRILLING FROM EITHER SIDE OF THE CARRIER AND ON A 15% SLOPE. MAST JIB SHALL BE ABLE TO LIFT AND DROP INTO THE HOLES, STEEL RAILROAD RAILS UP TO 40 FEET IN LENGTH AND WEIGHING UP TO 2, 000 POUNDS. DRILL SHALL HAVE A MINIMUM 150 H. P. MOTOR AND AT LEAST A 300 CFM COMPRESSOR CAPABLE OF 16, 000 POUNDS OF PULL DOWN PRESSURE. PAYMENT WILL BE MADE ON THE PART OF THE RAIL THAT IS SATISFACTORILY PLACE BELOW GROUND LEVEL. NO PAYMENT WILL BE MADE FOR THE PART OF THE RAIL EXTENDING ABOVE THE HOLE. CONTRACTOR IS RESPONSIBLE FOR CUTTING ANY RAILROAD STEEL THAT IS NOT FLUSH WITH THE ESTIMATED FINISHED SHOULDER AFTER BEING DROPPED INTO DRILLED HOLES. CONTRACTOR MUST BE ABLE TO DRILL AND INSTALL 800 FT OF RAILROAD STEEL PER 8 HOUR WORKDAY. LEEWAY WILL BE GIVEN FOR WEATHER AND UNFORSEEN CIRCUMSTANCES AT THE DEPARTMENTS DISCRETION. THE TRANSPORTATION CABINET MAKE NECESSARY SITE PREPARATION AND FURNISH NECESSARY TRAFFIC CONTROL.
Eq Rental Offset Drill w/Operator D- 9 - State
Bid Close Date:
Lot 5: Perform excavation as the slide repair dictates or as directed by the Engineer. Excavate each slide repair area to provide a platform for drilling the used railroad rails, if necessary. Excavate material as directed by the engineer wide enough to place cribbing and enough area for granular backfill. Equipment shall be capable of excavating a vertical trench to install cribbing up to 16 feet in depth from the roadway elevation. Method of excavation shall limit the damage or removal of the existing roadway pavement as much as possible. Excavating equipment bucket size and width shall be adjusted as directed by the engineer to achieve the excavation without damaging the pavement, utilities, drill steel, etc. Do not use excavated material from the site as fill material. If directed by the Engineer, additional excavation may be required to remove slide material from the roadway in order to maintain traffic or to eliminate the pavement break for future asphalt paving. Unless directed by the Engineer, excess excavation may be wasted at sites on the right- of- way, only if approved by the Engineer. Material may not be wasted in flood prone areas or in streams. If the Engineer deems no suitable sites are available within the right- of- way, the contractor will be required to waste excess material off the right- of- way at sites obtained by the contractor at no cost to the KY Dept. of Transportation. Excavation will be paid by field measurement.
Lot 1: See Specification Section 1. 00 ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. See attached document How to Respond to an Online Bid through the Kentucky Vendor Self Service site ( updated). pdf. Please enter contact person, phone number and email in the Comments Section. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correc
Lot 2: Vendor supplied traffic control for drilled railroad rail drilling operation; Vendor shall provide flagging when requested. If Department provides traffic control, the flagging line item will not be included on the individual Delivery Order for Offset Drill with Operator. Item includes the appropriate number of flaggers for traffic control on the worksite. Each flagger will be paid at the hourly rate. With permission from the Engineer, the vendor may elect to use temporary traffic signals or portable traffic signals with appropriate signing in accordance with MUTCD or as directed by the Engineer. Vendor must also place and maintain appropriate work zone signing, flagger signs, flagger paddles, etc. in accordance with the MUTCD or as directed by the Engineer. Flagmen are required to wear appropriate safety equipment and must stay in constant communication with one another. Flaggers must work in accordance with Kentucky Dept of Highways Standard Drawings, in accordance with the MUTCD, and comply with Section 112 of the current Standard Specifications for Road and Bridge Construction at all times. Lane closures will only be permitted during daytime hours unless approved by the engineer. Payment will be made for the total number of man- hours worked for supplied traffic control each day. If vendor supplies portable traffic signals, payment by the man- hour will be based on number of man- hours flaggers would have been utilized instead of portable signals.
Lot 3: Vendor to provide used railroad rail. To be completed as stated in the extended description line 1 with the vendor providing the necessary used railroad rail. Use recycled ( used) railroad rails classified with a nominal weight of 130 lb/yd ( pounds per yard) size or greater. Use only visibly straight recycled rails with no splices. The Engineer will verify rail nominal weights ( manufacturer' s stamp with lb/yd, date, etc. ). Provide certification for nominal weight if the manufacturer' s stamp is unidentifiable.
Lot 4: Vendor to install cribbing at slide location as directed by the Engineer. Extend wall cribbing 2 feet to 16 feet as directed by Engineer below the existing ground line. If bedded rock is encountered, install the cribbing to the bedded rock only. The engineer will direct changes if necessary to the procedure. Vendor to furnish all labor and equipment to deliver and install wall cribbing on the recycled ( used) railroad rail piling. Wall cribbing shall be lapped, bolted, and attached solid to the drilled railroad rails. Use wall cribbing: recycled ( used) steel " w" beam guardrail shall be supplied by the KY Dept. of Transportation. Bolts, tie wire, welding, etc. needed to make the cribbing panels and attach to the drilled railroad rails will be furnished by the vendor. The Vendor is responsible for picking up the ( used) steel " W" beam guardrail at the local county Maintenance garage. Any unused ( used) steel " W" beam guardrail shall be returned to the maintenance garage by the vendor.
Lot 5: Perform excavation as the slide repair dictates or as directed by the Engineer. Excavate each slide repair area to provide a platform for drilling the used railroad rails, if necessary. Excavate material as directed by the engineer wide enough to place cribbing and enough area for granular backfill. Equipment shall be capable of excavating a vertical trench to install cribbing up to 16 feet in depth from the roadway elevation. Method of excavation shall limit the damage or removal of the existing roadway pavement as much as possible. Excavating equipment bucket size and width shall be adjusted as directed by the engineer to achieve the excavation without damaging the pavement, utilities, drill steel, etc. Do not use excavated material from the site as fill material. If directed by the Engineer, additional excavation may be required to remove slide material from the roadway in order to maintain traffic or to eliminate the pavement break for future asphalt paving. Unless directed by the Engineer, excess excavation may be wasted at sites on the right- of- way, only if approved by the Engineer. Material may not be wasted in flood prone areas or in streams. If the Engineer deems no suitable sites are available within the right- of- way, the contractor will be required to waste excess material off the right- of- way at sites obtained by the contractor at no cost to the KY Dept. of Transportation. Excavation will be paid by field measurement.
Lot 6: Vendor to furnish backfill material. Place Geotextile fabric as directed by the engineer, the geotextile fabric shall be lapped as outlined by the manufacture recommendations and Kentucky Standard Specifications. The geotextile fabric shall wrap the granular backfill to provide separation from all earth embankment. Construct granular embankment behind railroad rails, cribbing and on slope, as per Section 206 of the Kentucky Standard Specifications for Road and Bridge Construction, Current Edition. Backfill material shall be placed and compacted to eliminate voids. Construct embankment up to the approximate existing pavement elevation. Use the following backfill materials: Kentucky aggregate gradation no. 2' s /23' s or larger to the bottom of pavement elevation and place DGA Base from the bottom of the pavement elevation to the top of the existing pavement separated with Geotextile fabric as directed by the engineer. Backfill material shall meet requirements of Section 805 of the Kentucky Standard Specifications for Road and Bridge Construction, Current Edition. Backfill material delivered to the project, will only be accepted with a certified weigh ticket. A conversion factor of 1. 3 tons per cubic yard will be used to pay for all gradations of aggregate Backfill material delivered to the project. The Engineer will use visual inspection and/or material testing, as applicable to determine acceptability. Geotextile fabric shall be provided by the vendor. Vendor to furnish backfill material and labor to install geotextile fabric.
Lot 7: Vendor furnished laborer to trim tree limbs, extend Department furnished culvert pipe through crib wall, and taking down guardrail and stacking for the Department to pick up. The Department will be responsible for picking guardrail up and delivering to maintenance facility.
Lot 8: Vendor furnished bucket truck with operator capable of clearing tree limbs for a 40 feet drill mast. Vendor operator must be properly trained for the bucket truck operations and wear the appropriate safety equipment.
Lot 9: Vendor is to furnish and Install TY IV filter fabric for separation of the Backfill Material and Roadway Material. Payment per SQYD will include all labor, materials, and incidentals necessary to correctly install filter fabric in the slide area.
Lot 10: Vendor to furnish and install cribbing at slide location as directed by the Engineer. Vendor furnished cribbing must be galvanized guardrail, reinforced concrete panels, or equivalent material as approved by the engineer. The cribbing material must be corrosion resistant and be capable of holding backfill material across a span of 3 to 4 feet. Extend wall cribbing 2 feet to 16 feet as directed by Engineer below the existing ground line. If bedded rock is encountered, install the cribbing to the bedded rock only. The engineer will direct changes if necessary to the procedure. Vendor to furnish all labor and equipment to deliver and install wall cribbing on the recycled ( used) railroad rail piling. Wall cribbing shall be lapped, bolted, and attached solid to the drilled railroad rails. Bolts, tie wire, welding, etc. needed to make the cribbing panels and attaching to the drilled railroad rails will be furnished by the vendor.
Lot 11: Vendor furnished cribbing material must be galvanized guardrail. The guardrail shall be delivered and paid in 12. 5 LF sections. 25 LF guardrail sections will be considered /accepted upon the engineer' s approval. The guardrail material must be corrosion resistant, hole punched as shown for standard guardrail installation, and straight. KYTC will unload the material. Minimum order of 5, 625 Sq. Ft. MODIFIED ROTARY DRILL WITH OPERATOR( S). DRILL TO BE TRUCK MOUNTED AND CAPABILITY OF DRILLING 7" TO 10" DIAMETER HOLES 40 FEET INTO SOIL AND ROCK. ROTARY DRILL MUST HAVE CAPACITY OF DRILLING OFFSET A MINIMUM OF FIVE ( 5) FEET FROM THE EDGE OF THE TIRE TO THE CENTER OF THE HOLES, DRILLING FROM EITHER SIDE OF THE CARRIER AND ON A 15% SLOPE. MAST JIB SHALL BE ABLE TO LIFT AND DROP INTO THE HOLES, STEEL RAILROAD RAILS UP TO 40 FEET IN LENGTH AND WEIGHING UP TO 2, 000 POUNDS. DRILL SHALL HAVE A MINIMUM 150 H. P. MOTOR AND AT LEAST A 300 CFM COMPRESSOR CAPABLE OF 16, 000 POUNDS OF PULL DOWN PRESSURE. PAYMENT WILL BE MADE ON THE PART OF THE RAIL THAT IS SATISFACTORILY PLACE BELOW GROUND LEVEL. NO PAYMENT WILL BE MADE FOR THE PART OF THE RAIL EXTENDING ABOVE THE HOLE. CONTRACTOR IS RESPONSIBLE FOR CUTTING ANY RAILROAD STEEL THAT IS NOT FLUSH WITH THE ESTIMATED FINISHED SHOULDER AFTER BEING DROPPED INTO DRILLED HOLES. CONTRACTOR MUST BE ABLE TO DRILL AND INSTALL 800 FT OF RAILROAD STEEL PER 8 HOUR WORKDAY. LEEWAY WILL BE GIVEN FOR WEATHER AND UNFORSEEN CIRCUMSTANCES AT THE DEPARTMENTS DISCRETION. THE TRANSPORTATION CABINET SHALL PROVIDE RAILROAD RAILS, MAKE NECESSARY SITE PREPARATION AND FURNISH NECESSARY TRAFFIC CONTROL.
Lot 12: Modified rotary drill with operator( s). Drill to be truck- mounted and capability of drilling 7" to 10" diameter holes 40 feet into soil and rock. Rotary drill must have capacity of drilling offset a minimum of five ( 5) feet from the edge of the tire to the center of the holes, drilling from either side of the carrier and on a 15% slope. Mast jib shall be able to lift and drop into the holes steel railroad rails up to 40 feet in length and weighing up to 2, 000 pounds. Drill shall have a minimum 150 h. P. Motor and at least a 300 cfm compressor capable of 16, 000 pounds of pull down pressure. Payment will be made on the part of the rail that is satisfactorily placed below ground level. No payment will be made for the part of the rail extending above the hole. Contractor is responsible for cutting any railroad steel that is not flush with the estimated finished shoulder after being dropped into drilled holes. Contractor must be able to drill and install 800 ft of railroad steel per 8- hour workday. Leeway will be given for weather and unforeseen circumstances at the department' s discretion. The transportation cabinet shall provide railroad rails, make necessary site preparation and furnish necessary traffic control.
Lot 13: Vendor to provide used railroad rail. This includes drilling the hole, providing and placing the rail. Use only visibly straight recycled rails with no splices. The Engineer will verify rail nominal weights ( manufacturer' s stamp with lb/yd, date, etc. ). Provide certification for nominal weight if the manufacturer' s stamp is unidentifiable. This line item shall be used for all work paid using STATE funds. MODIFIED ROTARY DRILL WITH OPERATOR( S). DRILL TO BE TRUCK MOUNTED AND CAPABILITY OF DRILLING 7" TO 10" DIAMETER HOLES 40 FEET INTO SOIL AND ROCK. ROTARY DRILL MUST HAVE CAPACITY OF DRILLING OFFSET A MINIMUM OF FIVE ( 5) FEET FROM THE EDGE OF THE TIRE TO THE CENTER OF THE HOLES, DRILLING FROM EITHER SIDE OF THE CARRIER AND ON A 15% SLOPE. MAST JIB SHALL BE ABLE TO LIFT AND DROP INTO THE HOLES, STEEL RAILROAD RAILS UP TO 40 FEET IN LENGTH AND WEIGHING UP TO 2, 000 POUNDS. DRILL SHALL HAVE A MINIMUM 150 H. P. MOTOR AND AT LEAST A 300 CFM COMPRESSOR CAPABLE OF 16, 000 POUNDS OF PULL DOWN PRESSURE. PAYMENT WILL BE MADE ON THE PART OF THE RAIL THAT IS SATISFACTORILY PLACE BELOW GROUND LEVEL. NO PAYMENT WILL BE MADE FOR THE PART OF THE RAIL EXTENDING ABOVE THE HOLE. CONTRACTOR IS RESPONSIBLE FOR CUTTING ANY RAILROAD STEEL THAT IS NOT FLUSH WITH THE ESTIMATED FINISHED SHOULDER AFTER BEING DROPPED INTO DRILLED HOLES. CONTRACTOR MUST BE ABLE TO DRILL AND INSTALL 800 FT OF RAILROAD STEEL PER 8 HOUR WORKDAY. LEEWAY WILL BE GIVEN FOR WEATHER AND UNFORSEEN CIRCUMSTANCES AT THE DEPARTMENTS DISCRETION. THE TRANSPORTATION CABINET MAKE NECESSARY SITE PREPARATION AND FURNISH NECESSARY TRAFFIC CONTROL.
Choose an example to see how smart search can help.
You supply: Office chairs
How a solicitation might describe it
The seating is described by its use, without repeating the product name.
Smart search helps connect what you supply with different descriptions. Try it with your own products during the free trial.
Start free trialYou supply: Pest control
How a solicitation might describe it
A different expression describes a related service.
Smart search helps connect what you supply with different descriptions. Try it with your own products during the free trial.
Start free trialYou supply: Toilet paper
How a solicitation might describe it
Another description of the product, including a purchasing specification.
Smart search helps connect what you supply with different descriptions. Try it with your own products during the free trial.
Start free trialFictional examples to explain how it works. This example does not run a search.
Enter your email to start the free trial. There are no automatic charges.
Add your specific products or services and the locations you want to search. Your first monitoring group is created for you.
Matching bids appear as soon as you save your products and locations. Explore groups and email settings at your own pace.
The tool is truly effective at scanning bid documents, efficiently delivering bids.
Excellent information. Just what I was looking for.
Good information. All the information is very good!
Everything is perfect. They are a great help in finding bids relevant to our field of work. I really appreciate that the bids are sent directly to my email; it’s a huge help in identifying where I can contribute and what I can do.
All bids related to our product are captured by you and sent to us. In my opinion, it’s perfect—broad coverage and easy searches across the bid documents.
Very good and accurate information about the tenders: consistent and precise.
I like the way they provide information with the greatest possible accuracy. I love that.
It encompasses all portals in one place.
Efficiency in search times.
Smart search helped discover bids I hadn't even imagined receiving notifications for.
I closed deals thanks to the information gathered by the search tool. There’s no need to research across multiple media outlets.
They notify me promptly when a contest is published.
You see a lot of tenders; you get emails with the alerts.
Filter bids, save promising opportunities and ask questions about solicitation documents.
Filter by location, procurement type and value. View opportunities on the map to decide what deserves a closer look.
Save the bids that interest you and add private notes, so you can return to your review later.
Ask questions about documents the system can read. Check the answers against the solicitation documents and the official source.
Add what you sell, get scheduled alerts, open documents or the official page, and use filters by region and method.