Turtle Mountain Public Utilities Commission - Houston Engineering
Operational Improvements Phase III - The Work is for a sanitary sewer lift station, water treatment plan upgrades, and water meter installation project located in Rolette County, ND. The Work includes but is not limited to Mobilization which includes TERO Fees ( 3% of Bid), EPA Fees ( 1% of Bid). The sanitary sewer lift station installation includes, but is not limited to, clearing and grubbing, erosion control, demolition of existing lift station, bypass pumping, excavation, lift station construction ( own
Sanitary sewer lift station, water treatment plant upgrades, and water meter installation project Mobilization, sanitary sewer lift station installation, clearing and grubbing, erosion control, demolition of existing lift station, bypass pumping, excavation, lift station construction, owner supplied control panel and backup generator, sanitary sewer gravity and force main piping, manhole construction, water service line connection, existing system interconnections, pressure testing and disinfection, access road construction, site reclamation with seeding and mulching, water treatment plant upgrades, raw water influent improvements, high service pump area modifications, upsizing influent piping, replacing undersized meters, control valves, rearranging ductile iron process piping, valves and fittings, new vertical turbine pumps, pipeline interconnections, modifications to concrete clearwell reservoirs, industrial coatings, electrical instrumentation and controls, hydrostatic testing
Bid Close Date: