Kc Board Of Public Utilities - KS
On- Call Industrial Painting Services - 1. Contractor shall perform the following: a. Remove all existing paint and/or wall coverings. b. Provide all necessary equipment, tools, and materials required to complete the interior/exterior painting work. c. Removal of existing paint. d. Washing and disinfection. e. Mudding and taping of all drywall joints. f. Sand walls as required for uniform smooth finish. g. Application of primer. h. Application of two ( 2) coats of paint, minimum, with no bleed through aft
Bid Close Date: