City Of San Mateo - CA
Sludge Handling/ Polymer Pumps
Polymer Injection System Project - Engineers Estimate: $ 297, 051 | The proposed work is as follows: The Project is located at the City' s Wastewater Treatment Plant located at **** Detroit Dr, San Mateo, CA 94404. The work involves the construction of a polymer injection system to reduce sludge cake pump operating pressures and improve the reliability of the sludge handling process. The Work is generally described as follows: 2. 1. 1. Construction of two new polymer pumps on concrete equipment pads. 2. 1.
Polymer injection system construction Construction of two new polymer pumps on concrete equipment pads, construction of two new polymer injection rings, associated piping, valves, and appurtenances, associated electrical and instrumentation work including new local control panel.
Bid Close Date: