Missouri Western State University - MO
Fiber Termination/ Campus Network Infrastructure
Campus Fiber Backbone Installation Project
Installation of underground conduit and fiber optic cable at Missouri Western State University campus Scope 1: Install underground conduit and fiber optic cable from existing splice point on west campus drive to Kit Bond Incubator Building; approximately **** feet of conduit and **** feet of fiber; includes 2- inch HDPE conduit, **** underground handholes, 12 solid copper tracer wire, 12- count single mode fiber optic cable, splicing to 72- count fiber, fiber housings, panels, and SCAPC terminations. Scope 2: Install underground conduit and fiber optic cable from existing splice point on west campus drive to Physical Plant Main Office Building; approximately 650 feet of conduit and 900 feet of fiber; includes 2- inch HDPE conduit, handholes, tracer wire, 6- count single mode fiber optic cable, splicing to 72- count fiber, fiber housings, panels, and SCAPC terminations.