U3P - Utah Public Procurement Place - UT
Well # 1R Drilling Project - Drilling of an exploratory pilot hole followed by reaming for construction of a production well using the reverse- rotary drilling method. The well is to be used in the Orem City drinking water system. Well # 1R is anticipated to be completed with a 20- inch diameter casing to a total depth of approximately 800 feet. Anticipated production is from multiple Pleistocene alluvium aquifers.
Bid Close Date: