The contractor must supply and install one 160 kva UPS system at JFHQPR Bldg. 552, including removal of the old unit, and supply four 10 kva UPS systems for delivery to USPFO warehouse Bldg. 541. The 160 kva installation requires full labor, material, and installation services, including EPO and FM200 interface wiring. All work must be completed within 90 calendar days from the receipt of order (ARO). The award will be based on the lowest priced conforming quote. The solicitation is set aside for 100 small business concerns.
The overall period of performance remains 90 days after receipt of order (ARO). overall period of performance remains 90 days aro.
UPS electronics power modules must have a minimum three years parts and labor warranty, and batteries must have a minimum two years for VRLA or the manufacturer's standard published warranty for lithium-ion, whichever is longer, but not less than two years. UPS electronics power modules: minimum three 3 years parts and labor.
The government will issue a firm fixed price FFP purchase order to the responsible quoter who offers the lowest priced conforming quote. the government will issue a firm fixed price ffp purchase order to the responsible quoter who offers thelowest priced conforming quotethat meets or exceeds the governments specified requirements
A limited postaward verification visit prior to equipment shipment to confirm floor space, nearest electrical panel location, short interconnect requirements, EPO button location, and FM200 drycontact interface points is required. limited postaward verification visit prior to equipment shipment to confirm floor space, nearest electrical panel location, short interconnect requirements, epo button location, fm200 drycontact interface points, and any sitespecific constraints.
Questions must be submitted no later than September 16, 2026, 4:00 p. m. questions: submit questions to the same email address no later than 16 september 2026, 4: 00 p. m.
The 160 kva replacement at Bldg. 552 is the priority effort and shall be completed first. the 160 kva replacement at bldg. 552 is the priority effort andshall be completed first.