Greer Commission Of Public Works
High- and Low- Level Meter Pit Upgrades- The Project consists of but is not limited to the following: installation of temporary and permanent bypass piping for the high- level and low- level metering pits including piping and appurtenances; demolition and replacement of existing meter pit piping, couplings, gate valves, butterfly valves, air release valves, sampling lines, control wiring and conduit, and concrete valve vault tops; relocation of the flow transmitters; demolition and replacement of the high-
Bid Close Date: