USA | HI | HONOLULU COUNTY | FORT SHAFTER | 96819
Cable Installation/ Cable Testing
MULTIPLE AWARD LAN/DLAN SIPR- NIPR BPA - The contractor shall provide all personnel, management, supervision, tools, testing apparatus, materials, Contractor- Furnished Material ( CFM), transportation, and engineering services necessary to perform Inside Plant ( ISP) structured cabling desi
Inside plant ( ISP) structured cabling design, installation, testing, and repair for NIPRNet and SIPRNet physical layer infrastructure Structured cabling design, horizontal cable distribution, fiber/copper installation, diagnostic troubleshooting, repair, copper Category 6A cabling, single- mode/multimode optical fiber cabling, equipment racks, cabinets, cable management, patch panels, faceplates, grounding infrastructure, firestopping remediation
AI helper
BPA for inside plant structured cabling on NIPRNet and SIPRNet across US Army installations in Hawaii, Alaska, and USINDOPACOM AOR. Contractor provides all materials (100% CFM), labor, and engineering. Base period 12 months plus four 12-month options. Work during normal duty hours **** HST, with emergency response 2-4 hours. Requires Secret clearance for SIPRNet access. 12-month workmanship warranty. Must submit QCP within 30 days of award. All components must be on DoDIN APL. No outside plant work included.
Each task order specifies its own discrete period of performance and milestone completion schedule. each individual task order issued against this bpa shall specify its own discrete period of performance and milestone completion schedule.
The contractor shall warrant all installation workmanship for a minimum of 12 months from formal government acceptance. the contractor shall warrant all installation workmanship, physical cabling, terminations, patch panels, raceways, grounding infrastructure, and repair actions for a minimum period of twelve 12 months from the date of formal government acceptance.
Contractor must maintain local technical support on Oahu and provide roster within 5 business days of award. the contractor shall maintain local technical support resources on the island of oahu, hawaii. . . this roster shall be submitted within five 5 business days of award
Contractor failure to maintain standards may result in corrective action requests, payment withholding, or adverse CPARS reporting. contractor failure to maintain acceptable standards or correct deficiencies within specified timeframes may result in the issuance of formal corrective action requests cars, payment withholding pursuant to far ****, or adverse cpars reporting.