Procurement of a warehouse racking system for installation at **** Dudley Blvd, McClellan, CA 95652. The contractor must provide all labor, materials, and supervision. The system must be selective pallet racking, 25 ft. height, 96 in. width, 42 depth, with a minimum load capacity of 12,000 lbs per level. The contractor must conduct a preinstallation site visit. Quotes must be submitted via email to Leah Smith by 20260831. The contract is set aside for small businesses, including women-owned small businesses and veteran-owned small businesses.
The contractor shall complete all work within 30 calendar days from the notice to proceed. The contractor shall complete all work within 30 calendar days from the notice to proceed.
Invoices shall be submitted upon delivery, inspection and government acceptance. invoices shall be submitted in arrears: . . . x upon delivery, inspection and government acceptance.
The contractor shall provide warranty documentation for materials and workmanship, with a minimum of 1 year on labor. warranty documentation minimum 1 year on labor, manufacturer warranty on materials
The government will award the contract to the responsible offeror whose offer is most advantageous to the government, considering price and other factors. the government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the government, price and other factors considered.
The contractor shall conduct a preinstallation site visit to verify measurements and installation conditions. The contractor shall conduct a preinstallation site visit to verify measurements and installation conditions
Any questions must be received 2 business days before the closing date. any questions must be received 2 business days before the closing date.
Failure to respond to all the evaluation factors or respond in sufficient detail may result in the quote being eliminated from competition. failure to respond to all the evaluation factors or respond in sufficient detail for the government to conduct a meaningful evaluation may result in your quote being eliminated from competition prior to evaluation.
The government reserves the right to consider a quotation other than the lowest price that provides additional benefits. The government reserves the right to consider a quotation other than the lowest price that provides additional benefits.