Indefinite delivery purchase order for door frame and door repair/replacement services at Defense Supply Center Richmond. Contractor must respond within 2 business days of notification, conduct site visit, and provide proposal within 1 business day. Work includes various door types with sensors, access control, and safety features. Requires 5 years experience, NFPA 80 certification for fire door inspection. Site visit scheduled for 12/03/2026 at **** expected on or around 11/19/2026. One-year warranty required. Security vetting required for base access.
Repairs must be made within one week of receiving materials. Parts must be ordered within two business days after award. The completion date shall be no later than 5 years after notice to proceed. As stated: any repair or replacement shall be made within one week of receiving materials.
Invoices submitted monthly via WAWF. No payments above 80% of total contract value until final inspection is complete and accepted. As stated: no payments above 80 of the total contract value will be paid until the work final inspection is complete and accepted.
One-year warranty required for all work performed. Contractor must respond on site within 2 business days of warranty notification. As stated: the contractor shall provide a oneyear warranty for all work they perform and physically respond on site within 2 business days after being notified of a warranty issue.
Proposals evaluated as technically acceptable or technically unacceptable. Must meet minimum requirements with no deficiencies. As stated: the submission will be deemed either technically acceptable or technically unacceptable.
Contractors must have minimum 5 years experience repairing/replacing doors and be capable of inspecting rolling fire doors per NFPA 80, 2022. As stated: contractors shall have a minimum of 5 years experience repairingreplacing doors and capable of inspecting rolling fire doors, drop tests etc. with inhouse technicians per nfpa 80, 2022.
Liquidated damages shall be assessed for noncompensable delays. As stated: liquidated damages shall be assessed for noncompensable delays wherein the work is not accepted prior to the scheduled completion date.
Site visit rescheduled for 12/03/2026 at **** register through DBIDS and email QR code to project manager at least 5 business days prior. As stated: the previously scheduled site visit has been rescheduled for 12/03/2026 at ****.
Failure to provide all required documents at submission time results in technically unacceptable proposal. As stated: failure to provide all required documents will result in contractors proposaloffer being technically unacceptable.