Lower Brushy Creek Water Control And Improvement District ( Wcid)
**** - Principal Spillway Conduit Repairs - Sites 3, 10 and 30 The Project includes the following work at three dam sites: 1. Removal and replacement of the two most downstream pipe segments. Installation of a new reinforced concrete collar. 2. Plunge pool improvements including rock riprap liner. 3. Installation of cured- in- place pipe lining throughout the length of the principal spillwayconduit ( Sites 3 and 30 only). Please direct all questions related to the design of this Project to the Q& amp; A
Principal spillway conduit repairs at sites 3, 10, and 30
Bid Close Date: