Boston Planning & Development Agency - MA
12 Channel Fire Pump & Controller Replacement The consultant will draft two potential concept designs complete with rough cost estimates for one to be advanced to Design Development and then to provide final Construction Documents (" CDs"). Two concept designs will be drafted to determine the potential location( s) of the new fire pump room in best efforts of staying in accordance with current Design Flood Elevations (" DFE"), budget and operational needs of the building prior to proceeding to Design Develo
Fire pump & controller replacement 12 channel fire pump & controller replacement
Bid Close Date: