06/20/2025 - USA | OR | BAKER COUNTY | BAKER CITY | 30125 Small City
Bid 2025- 03 PVC and Ductile Iron Pipe Ductile Iron Fittings Appurtenances
PVC and ductile iron pipe, ductile iron fittings, hydrants, appurtenances 8 **** polyvinyl chloride pvc dr 18 pipe 1, 020 ft, 6 **** polyvinyl chloride pvc dr 18 pipe 80 ft epoxy coated 8 mj x mj ductile iron gate, 6 ea valve, epoxy coated 8 mj ductile iron cross, 1 ea epoxy coated 8 mj 45 degree ductile iron elbow, 2 ea epoxy coated 8 x 6 mj ductile iron reducer, 2 ea g 8 x 6 mj ductile iron reducer, 1 ea h 8 x 6 mj x flg ductile iron reducer, 5 ea i 8 ductile iron mj adaptor, 5 ea 8 megalug **** or equal single joint, j 29 ea restraint, k 8 megalug **** or equal single joint restraint, 10 ea epoxy coated 8 cast iron x pvc mj coupling, l 1 ea dresser style epoxy coated 8 ductile iron x pvc mj coupling, m 1 ea coupling dresser style, n epoxy coated 8 x 6 mj x flg ductile iron tee, 1 ea o epoxy coated 8 mj ductile iron tee, 2 ea p 8 ductile iron solid sleeve coupling, 4 ea q 8 tapping sleeve, 6 megalug **** or equal single joint, r 4 ea restraint, s 6 megalug **** or equal single joint restraint, 1 ea
AI helper
Sealed bids will be accepted for PVC and ductile iron pipe, ductile iron fittings, hydrants, and other appurtenances. Bid closing date and time: July 2, 2025, 2:00 PM PDT. Bid packets are available from June 18, 2025, in the current solicitations section under the services tab at www. ***. *. * of materials must be completed by July 31, 2025. All material must be manufactured in the US or in accordance with applicable Awwa standards at ISO 9001:2000 approved manufacturing facilities. The city reserves the right to increase or decrease the quantity of material or reject any or all bids.