City Of Council Bluffs - IA
Traffic Control/ Sanitary Sewer Vacuum Main Installation/ Vacuum Valve Pit Package
East Manawa Sewer Rehabilitation, Phase XIV; PW26- 09 - The City of Council Bluffs Public Works Engineering Division is requesting bids for all work set forth in the plans, specifications, and proposals for this project. Note: Insurance requirements have been updated, see Instructions to Bidders. Major items of work for this project include the following approximate quantities: DIVISION I: GENERAL
East Manawa Sewer Rehabilitation, Phase XIV General Traffic Control 1 LS Pavement Removal/Disposition **** SY Pavement and Appurtenances SY 4 inch Porous HMA Base Course 543 Ton 2 inch Porous HMA Surface Course 272 Ton Subgrade Preparation **** SY Storm Sewer Storm Sewer Pipe, 15 inch Slotted **** 340 LF Storm Sewer Pipe, 24 inch Slotted **** 570 LF Storm Sewer Pipe, 30 inch Slotted **** 25 LF Storm Sewer Pipe, 36 inch RCP Class III 95 LF SW401 48 inch I. D. Circular Storm Sewer Manhole with Inlet Top 12 VF SW401 60 inch I. D. Circular Storm Sewer Manhole with Inlet Top 8 VF SW401 60 inch I. D. Circular Storm Sewer Manhole 4 VF SW401 72 inch I. D. Circular Storm Sewer Manhole 5 VF End Wall with Flap Gate, 36 inch RCP 1 EA Sanitary Sewer 6 inch Sanitary Sewer Vacuum Main, Trenched 549 LF 8 inch Sanitary Sewer Vacuum Main, Trenched 333 LF Vacuum Valve Pit Package, **** 11 EA Dewatering 1 LS
Bid Close Date: