09/02/2025 - USA | GA | BIBB COUNTY | MACON | 31201 Small City
Vandalism Insurance
26- 009- LH Paving the Way Project 1 ( IFB) ( 10/2/25)
Paving the way project 1 for the Macon- Bibb County engineering department milling tons ****, bituminous tack gal ****, roadway patching sy ****, 12. 5 mm superpave asphalt tons ****, 9. 5 mm superpave asphalt tons 0, install furnished sewer manhole, ea 11, storm manholes, install furnished water valve 12, risermanhole adjustment ea 11, water valve adjustment ea 12, traffic signal loop install ea 0, striping center lines, edge lf ****, lines, lane linespainted arrows ea 3, bike symbols ea 0, painted messages ea 0, painted crosswalks lf 0, painted stop bars lf 56, painted rr symbols ea 0, painted hatching lf 340, rumble stripe set 0rpms mile 9. 53, clipping grassed shoulders mile ****
AI helper
Sealed bids are requested for Paving the way project 1. Bid documents are available at the Macon-Bibb County procurement department. A pre-bid conference is scheduled for September 10, 2025. Bid deadline is October 2, 2025, at 12:00 noon. Bids must include a bid bond of 5% of the total base bid. The contract will be awarded based on total bid price. The successful bidder will be required to contact specific entities regarding coordination with utilities. A 1-year warranty is required. Subcontractor reporting requirements are quarterly. The county may withhold payment for failure to submit the required reports.
The bid deadline is 12:00 noon on Thursday, October 2, 2025. otice is hereby given that the maconbibb county board of commissioners will receive sealed bids . . . until 12: 00 oclock noon at the time legally prevailing in macon, georgia on thursday, october 2, 2025
A 10% retainage will be withheld from each payment until final payment is made. The owner will only pay for items used and actual work performed. Change orders are issued for any variance from contract or plan sheets. Any unauthorized work or material change will not be paid for unless a change order has been issued. he county inspector will collect material tickets, measure and inspect work completed to date on said job and report to the project manager for payment. a 10 retainage will be withheld from each payment until final payment is made. the owner will only pay for items used and actual work performed.
The contractor shall guarantee all labor and workmanship for a minimum of one year from the date of completion. he contractor shall guarantee all labor and workmanship for minimum of one 1 years from date of completion.
The contract will be awarded based on total bid price. he contract, if awarded, will be based on total bid price.
Liquidated damages of $75 will be charged for each day the project is delayed beyond the completion date. liquidated damages in the amount of 75 shall be charged to the contractor for each day that the project is delayed beyond the completion date of the contract.
Bidders are required to visit the site and become familiar with the local conditions. each bidder, by making his bid, represents that he has: a read and understand the bidding documents and, b visited the site and became familiar with the local conditions under which the work is to be performed.