City Of Chipley-FL
City of Chipley Wastewater Improvements Project
City of Chipley Wastewater Improvements Project replace two existing effluent pumps with new energyefficient units 125 hp each to improve discharge capacity and reduce energy consumption. replace four existing blower units with highefficiency models 75 hp each to enhance aeration performance and reduce power usage. install three new submersible influent pumps 38 hp each to ensure reliable and energyefficient wastewater handling. replace two existing reject pumps with new energyefficient units 20 hp each to improve waste stream management and lower operational costs. replace two filter feed pumps with highefficiency models 5 hp each to optimize filtration performance. replace two existing sequencing batch reactor sbr mixer motors with new energyefficient units 30 hp each to improve mixing efficiency. retrofit existing high mast lighting with energyefficient fixtures to reduce electrical usage and maintenance requirements.
Bid Close Date: