Commonwealth Of Kentucky - Office Of The Controller - KY
Waste Disposal/ Animal Waste Removal/ Waste Management
Khp night muck removal, loading, and hauling
Muck removal, loading, and hauling Night muck removal, loading, and hauling services for muck stall bedding shavings and horse manure from designated muck storage locations within barn complexes in event areas. Material must be dumped in the central muck disposal area. Hauling services involve loading material from the designated area and transporting it offsite for disposal.
Bid Close Date:
Lot 1: Remove muck ( stall bedding shavings and horse manure) from designated muck storage locations within the barn complexes in the event areas. Once loaded into dump trucks, the material should be dumped in the central muck disposal area at the back of the property behind the Alltech Arena. Work may not commence prior to 6: 00 pm and must be completed no later than 6: 00 am each night. The contractor shall provide all equipment necessary to perform the work. Equipment operators must be experienced in operating machinery in low- light conditions and accustomed to working safely in environments with horses. The contractor shall coordinate daily scheduling and operational details with Kentucky Horse Park staff to minimize disruption to Park activities and events.
Lot 2: The contractor shall load material located at the Kentucky Horse Park' s designated muck disposal area behind the Alltech Arena and transport the material off- site for disposal. The contractor shall provide all equipment, labor, transportation, and resources necessary to load and haul the material. The contractor shall coordinate the scheduling of loading and hauling services with designated Kentucky Horse Park staff prior to performing the work. The contractor shall contact KHP staff to coordinate the date and approximate time for each scheduled hauling service and shall make reasonable efforts to accommodate KHP' s operational and event schedules. Each load shall be weighed at an approved certified scale. The contractor shall provide KHP with a certified weigh ticket for each load verifying the gross weight, tare weight, and net weight of the material hauled. The certified net weight shown on the weigh ticket shall be used to calculate payment. The contractor shall submit copies of all weigh tickets with the corresponding monthly invoice. Invoices shall identify the date of service, number of loads, net weight of each load, total tons hauled, and applicable per- ton rate. The contractor shall be responsible for all costs associated with loading, transportation, weighing, and disposal of the material.