Lot 1: Mobilization, Demobilization and Final Cleanup
Lot 2: Traffic Control
Lot 3: Construction Survey
Lot 4: Remove Concrete ( Curb and Gutter)
Lot 5: Remove Concrete ( Sidewalk and Ramps)
Lot 6: Cold Plane Asphalt 3"
Lot 7: Conform Grind
Lot 8: Adjust Valve/Cleanout
Lot 9: Adjust Manhole
Lot 10: Hot Mix Asphalt
Lot 11: Minor Concrete ( Curb and Gutter)
Lot 12: Minor Concrete ( Driveway)
Lot 13: Minor Concrete ( Sidewalk)
Lot 14: Minor Concrete ( Curb Ramp)
Lot 15: Minor Concrete ( Cobble- Non- Walkable Surface)
Lot 16: Class 2 Aggregate Base ( Sidewalk Only)
Lot 17: Domestic Water Main ( 6- Inch, PC235)
Lot 18: Domestic Water Service ( 1- Inch) Meter ( 3/4- Inch)
Lot 19: Fire Hydrant and Lateral Assembly ( 4- Inch)
Lot 20: Tie- In Existing 4" & 6" Water Main
Lot 21: Pothole Existing Utilities
Lot 22: Abandonment of Existing Water Main
Lot 23: Storm Drain Curb Inlet
Lot 24: Storm Drain Manhole ( 48- Inch)
Lot 25: Remove & Replace Storm Drain Pipe ( 18- Inch ADA N12)
Lot 26: Modify Existing Storm Drain Manhole
Lot 27: Remove Existing Drainage Inlet
Lot 28: Remove Existing Storm Drain Manhole
Lot 29: Traffic Stripe ( Detail 22)
Lot 30: Traffic Stripe ( Detail 39)
Lot 31: Traffic Stripe ( Detail 39A)
Lot 32: Traffic Stripe ( Detail 38)
Lot 33: Thermoplastic Stripe ( 4- Inch White)
Lot 34: Thermoplastic Crosswalk ( White)
Lot 35: Thermoplastic Pavement Marker ( Bike & Arrow)
Lot 36: Thermoplastic Pavement Marker ( Sharrow)
Lot 37: Thermoplastic Pavement Marker ( Green Bike Lane)
Lot 38: Thermoplastic Pavement Marker ( Type IV Arrow)
Lot 39: Thermoplastic Pavement Marker ( Parking Tee)
Lot 40: Thermoplastic Pavement Marker ( STOP - White)
Lot 41: Remove/Replace Sign Post
Lot 42: Fire Hydrant Retroreflective Marker
Lot 43: Asphalt Concrete 9- inch Digout