City Of Vancouver
Electrical Contractor
Hazel Dell Avenue and Burnt Bridge Creek Trail Crossing This Contract provides for the improvement of *** Hazel Dell Avenue between the Burnt Bridge Creek Trail termini. Work includes a 10- ft pervious concrete multi- use path connection on thewest side of Hazel Dell Ave from the south east Burnt Bridge Creek Trail termini approximately 800ft to the north to the west Burnt Bridge Creek Trail termini. Additionally, ADA ramps, aRectangular Rapid Flashing Beacon and 2 proposed luminaires will be constructed***
Improvement of Hazel Dell Avenue between the Burnt Bridge Creek trail termini, including a pervious concrete multi- use path connection, ADA ramps, a rectangular rapid flashing beacon, and luminaires. 10- ft pervious concrete multi- use path, ADA ramps, rectangular rapid flashing beacon, 2 luminaires, surveying, record drawings, SPCC plan, mobilization, pedestrian traffic control, construction signs, flaggers, traffic control supervisor, work zone safety contingency, temporary traffic control devices, access plan and construction staging, temporary pedestrian access plan, clearing and grubbing, sawcut, removal of structures and obstructions, roadway excavation, embankment compaction, crushed surfacing base course, planing bituminous pavement, HMA, pervious cement concrete, gravel backfill for drain, adjust manhole, adjust water meter and box, ESC lead, inlet protection, high visibility silt fence, erosion control, topsoil, seeded lawn, mulch, groundcover, shrubs, tree, root barrier, plant establishment, curb
Bid Close Date: