City Of Laredo
Blade Angle
RFB 2026- 024 El Pico Water Treatment Plant Sedimentation Basin Rehabilitation - Utilities Department - Vendors are strongly encouraged to attend the Pre- Bid meeting which is scheduled for Wednesday, December 17, 2025 at 2: 00 P. M. Location: **** Daugherty, Utilities Administration Office, Laredo, Texas 78041. The City of Laredo reserves the right to reject any and all bids, and to waive any minor irregularities. ** If the bidder submits both an electronic bid and a properly completed manual bid, the Purc
RFB **** El Pico Water Treatment Plant Sedimentation Basin Rehabilitation 1. 1 Mobilization and demobilization for the lump sum. 1. 2 Provide crack injection on the interior of the sedimentation basin. 1. 3 Provide crack injection on the exterior of the sedimentation basin. 1. 4 Provide replacement of vertical joint filler/sealant on the interior of the sedimentation basin. 1. 5 Provide replacement of vertical joint filler/sealant on the exterior of the sedimentation basin. 1. 6 Provide specialty joint sealer system Combiflex or approved equal on the interior wall of the sedimentation basin. 1. 7 Provide interface sealant system floor and fillet Combiflex or approved equal on the interior of the sedimentation basin. 1. 8 Provide surface coating including primer, surface preparation, and environmental controls. 1. 9 Provide and install replacement of supports for effluent launders 316 stainless steel. 1. 10 Temporary bypassing of the settled water channel, provide, install, and remove bypass pumping insta
Bid Close Date: