Capital Construction Request - MD
**** /**** Cox Creek WRF Non- ENR Misc 2 Impr & Odor Control Sys Upg - The Work includes the following major items: **** - Replace existing air handler system ( HVAC Improvements), electrical, and ductwork; Replace existing drain pumps, VFDs, valves, and piping in Drain Pump Station; Install non- potable water to Digester Building; Install electric valve actuator; Replace bubbler level sensors with pressure transducer level meters. **** - Installation of a new BioAir Odor Control module; Reposi
**** **** cox creek wrf non enr misc 2 impr odor control sys upg the work includes the following major items: **** replace existing air handler system hvac improvements, electrical, and ductwork replace existing drain pumps, vfds, valves, and piping in drain pump station install non potable water to digester building install electric valve actuator replace bubbler level sensors with pressure transducer level meters. **** installation of a new bioair odor control module repositioning of the odor control tower installation of a new blower reconfiguration of ducting, electrical and instrumentation integration condition assessment and report of the odor control system. see notice to contractors for the pre bid meeting information prevailing wage eligible **** **** net 30 days
Bid Close Date:
Lot 1: S806104/s802384 part a base bid items 1- 5, part b base bid items 1- 4, contingency items 1- 14