USA | LA | SAINT TAMMANY COUNTY | MANDEVILLE | 70471 Small City
St. Tammany Parish Government - LA
Grand Ave
Grand Ave removal of asphalt pavement, asphalt concrete, asphalt concrete, drives, turnouts, misc, pavement patching 12 min. thickness, pavement widening, cross drain pipe arch 24 rcpa, side drain pipe arch 24 rcpa, clean existing pipes, catch basin cb01, temporary signs and barricades, bedding material, mobilization, reflectorized raised pavement markers, plastic pavement striping solid 4 width thermoplastic 90 mil, plastic pavement striping solid 24 width thermoplastic 90 mil, hydroseeding, construction layout, asphalt shoulder wedge
AI helper
The work must be completed within the number of calendar days specified in the proposal and/or the contract, commencing from the date specified in the notice to proceed. The work covered by the plans, specifications and contract documents must be completed sufficiently for acceptance within the number of calendar days specified in the proposal andor the contract, commencing from the date specified in the notice to proceed.
Monthly certificates for partial payment, in a form approved by the owner, shall be transmitted to the owner upon receipt from the contractor and acceptance by the owner. Monthly certificates for partial payment, in a form approved by the owner, shall be transmitted to the owner upon receipt from the contractor and acceptance by the owner.
The contractor warrants and guarantees to owner that all materials and equipment will be new unless otherwise specified and that all work will be of good quality and free from faults or defects and in accordance with the requirements of the contract documents. contractor warrants and guarantees to owner that all materials and equipment will be new unless otherwise specified and that all work will be of good quality and free from faults or defects and in accordance with the requirements of the contract documents.
The award of the contract, if it is awarded, will be to the lowest responsible bidder, in accordance with state law. he award of the contract, if it is awarded, will be to the lowest responsible bidder, in accordance with state law.
Only the contractors licensed by the state to do the type of work involved can submit a proposal for the work. Only the contractors licensed by the state to do the type of work involved can submit a proposal for the work.
If the contractor shall neglect, fail or refuse to complete the work within the time specified, or any proper extension thereof granted by the owner, then the contractor does hereby agree, as partial consideration for the awarding of this contract, to pay the owner based on table 3. 1 as specified in the contract, not as a penalty, but as liquidated damages for such breach of contract for each and every calendar day that the contractor shall be in default after the time stipulated in the contract for completing the work. it is further mutually understood and agreed that if the contractor shall neglect, fail or refuse to complete the work within the time specified, or any proper extension thereof granted by the owner, then the contractor does hereby agree, as partial consideration for the awarding of this contract, to pay the owner based on table 3. 1 as specified in the contract, not as a penalty, but as liquidated damages for such breach of contract for each and every calendar day that the contractor shall be in default after the time stipulated in the contract for completing the work.
Each bidder shall visit the site of the proposed work and fully acquaint itself with all surface and subsurface conditions as they may exist so that it may fully understand this contract. each bidder shall visit the site of the proposed work and fully acquaint itself with all surface and subsurface conditions as they may exist so that it may fully understand this contract.
Contractor shall also submit to owner, for review with such promptness as to cause no delay in work, all samples as required by the contract documents. contractor shall also submit to owner, for review with such promptness as to cause no delay in work, all samples as required by the contract documents.
Protests based on alleged solicitation improprieties that are apparent before bid opening, or the time set for receipt of initial proposals must be filed with and received by the procurement department before those deadlines. Protests based on alleged solicitation improprieties that are apparent before bid opening, or the time set for receipt of initial proposals must be filed with and received by the procurement department before those deadlines.
The price quoted for the work shall be stated in words and figures on the bid form, and in numbers only on the unit price form. he price quoted for the work shall be stated in words and figures on the bid form, and in numbers only on the unit price form.
Bid Close Date: