Engineering Bureau, Public Works - CA
David M. Gonzales Recreation Center Stormwater Capture Project - Constructs a 2. 6- acre underground infiltration gallery at the David M. Gonzales Recreation Center in Pacoima & modifies nearby storm drains serving a 759- acre tributary area with an estimated yield up to 448 AFY of stormwater runoff, in order to divert their flows to this facility, where the water will be infiltrated into the subsoil. Install ( SD): pipes diversion structures desilting basins hydrodynamic separators devices to co
constructs a 2. 6acre underground infiltration gallery at the david m. gonzales recreation center in pacoima & modifies nearby storm drains serving a 759acre tributary area with an estimated yield up to 448 afy of stormwater runoff, in order to divert their flows to this facility, where the water will be infiltrated into the **** 28sd **** **** basins5cr5cne299a6e299a620hydrodynamic **** to control & measure ****: ****, excavation & reconstruction of streets, sidewalks, curbs & gutters in city row****, excavation & construction within **** to restore park facilities ( including sports fields) & landscaping afterwards, and additional **** **** **** ****
Bid Close Date: