One-time contract to remove and replace fabric panels on an existing overhead door at Macomb Terminal, including two new window panels. Contractor must supply all labor, materials, equipment, tools, supervision, transportation, and disposal. Work includes lockout/tagout, photo documentation, counterweight adjustment, and functional testing. Minimum 1-year warranty on workmanship. Quotes due November 19, 2026, 3:00 PM ET. Electronic submission via Bidnet Direct or email. Lowest priced conforming bid from eligible offeror selected. Prequote conference not held. Site visit not applicable.
Quotes must be submitted by 3:00 pm ET, November 19, 2026. The RFQ states: your electronic submission must arrive in the ***@***. *. * email by 3: 00 pm et, november 19, 2026.
Invoices must be submitted electronically to ***@***. *. * within 60 days of service. For progress payments, contractor is paid 90% of amount earned, with 10% retained. The RFQ states: contractor shall be paid ninety 90 percent of the amount earned.
The contractor must provide a minimum one-year warranty on workmanship and pass through manufacturer warranties. The RFQ states: The contractor shall provide a minimum one 1 year warranty on workmanship and shall pass through all applicable manufacturer warranties.
The lowest priced conforming bid from an eligible offeror will be selected. The RFQ states: the lowest priced conforming bid from an eligible offeror will be the selected quote.
Offerors must have demonstrated experience in repair and installation of commercial or industrial overhead fabric doors. The RFQ states: Contractors submitting a quote shall have demonstrated experience in the repair and installation of commercial or industrial overhead fabric doors.
Termination for default may occur if contractor breaches terms or fails to cure defaults within 15 days. The RFQ states: This right to terminate or suspend may be exercised if the contractor fails to cure all defaults listed within the notice of default within fifteen 15 days.
Protests addressing solicitation adequacy must be received no later than 5 business days before the proposal due date. The RFQ states: Protests addressing the adequacy of the solicitation process. . . must be received by the general manager no later than five 5 business days before the proposal due date.
Failure to complete required forms or conform to requirements may result in rejection. The RFQ states: failure to complete any of these forms may result, at smarts sole discretion, in the rejection of that quote.