SOR Waterline Repair - The primary purpose and objective of this project is to outline the scope for the design and construction of a new 7, 900 feet high- pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This project
Waterline repair and construction Design and construction of a new 7, 900 feet high- pressure waterline, appurtenant systems, and associated control systems on the southeast side of KAFB. This includes an 8 inch, class 350 ductile iron pipe dip with cement mortar lining and an asphaltic seal coat, associated valves and fittings, SCADA upgrade, portable hoist, a new 15, 000 gallon tank with booster pumps, and a new 5, 000 gallon tank and pre- packaged pump station at the SOR site.