City Of Milford - CT
Hsg Bid Package 18 Canterbury **** v2
Residential Housing Rehabilitation Project Division 06: Woods and Plastics Breezeway remove existing corrugated sheeting material and framing. Remove existing storm doors and frames. Clean and prep concrete slab. Construct studwall framing on front street side and back yard side using pressure treated 2 x 4 lumber bottom plate and spf stud framing 16 o. c. . Framing should include rough framing for front and back doors. Division 07: Thermal and Moisture Protection Roof scope includes all structures remove all existing shingles down to the roof deck. Inspect all decking for worthiness. Include allowance for 10 sheets of 1, cdx plywood decking in the base bid. Replace as needed. Provide per sheet pricing for additional decking. Note: additional decking replacement beyond the allowance will require prior approval and must be submitted as a change order. Install Owens Corning WeatherLock Ice Water Shield at all gutter lines. Install Owens Corning Interwrap RhinoRoof UDL synthetic underlayment on all remaining roof