This is a statement of work for the **** USDB Textiles Warehouse Expansion and Renovation Project. The project involves sustainment, restoration, and modernization (SRM) of the warehouse, including an office addition, new truck dock, and repairs to mechanical, electrical, and fire protection systems. The contractor will be responsible for all aspects of construction, including supervision, labor, equipment, and materials. Key requirements include experience in managing multiple task orders, construction scheduling, cost estimating, quality control, and subcontractor coordination. Bonding is required for individual task orders. The contractor must provide a project manager and ensure all employees have identification badges. Insurance coverage is mandatory. The estimated price range for this project is between $1,000,000 and $5,000,000. The work includes structural engineering, fire sprinkler and alarm system modifications, and architectural and electrical updates. The contractor must coordinate with government representatives and adhere to normal working hours (7:00 am to 4:30 pm, Monday through Friday, excluding federal holidays). A significant aspect of the project is sustainable waste management, requiring 60% diversion from landfill disposal. As-built drawings, shop drawings, and operation and maintenance manuals are required. A DD Form **** transfer of real property must be submitted upon completion. A warranty must be provided. The contractor must comply with various building codes and safety standards, including OSHA and Army Corps of Engineers regulations. A site-specific safety plan is mandatory. Submittals, including preconstruction documentation, shop drawings, product data, and samples, must be submitted for approval. A quality control program is required, involving preparatory, initial, and continuing inspections. Project signage is also required. Utility service interruptions must be coordinated with the contracting officer. The statement of work also includes detailed specifications for asbestos abatement if encountered. The bid opening (IFB) is scheduled for April 14th, 2026, at 2:00 PM CST, at a new location: 731 McClellan Avenue, Bldg 48, Room 112, Fort Leavenworth, KS ****.
The bid notice states that the contractor is responsible for providing a list of material suppliers with names and phone numbers for all warranties to the contracting officer or their designated representative.
The bid notice states that the contractor shall provide a written report citing evidence of qualifications for personnel, facilities, and equipment assigned to the work.
The bid notice indicates that samples are a required submittal item (SW5a).
The bid notice states that the estimated price range for this project is between $1,000,000 and $5,000,000.