Dept Of Defense- Defense Logistics Agency- Dla Maritime- Dla Maritime Columbus- Dla Land And Maritime
Wire Rope Thimble
61-- braid, wire -
Government bid alerts, regional filters, and fast access to documents
Wire Rope Thimble
61-- braid, wire -
Extende CIVA Renewal ELMT STANDALONE - Synopsis: NASA/NSSC has a requirement for Extende CIVA Renewal ELMT STANDALONE. NASA/NSSC intends to issue a sole source contract to EXTENDE, INC. 733 Thimble Shoals BLVD ST
Bid Close Date:
RFB- 18- 27 Parks - Pennyrile Dam Repairs Study
Pennyrile Dam Repairs Study Removal of existing low level drawdown system and installation of new reinforced concrete stop log guide walls, including new sill and slots for new stop logs. Installation of a new low level drawdown system including new gate thimble, concrete overlay, and concrete operating platform. Leakage reduction items include installation of PZC18 metal sheet piling along the specified corridor and backfilling the area between sheet piling and upstream face of the dam. Downstream face masonry joint repairs, masonry stone replacement, and tree removal to support leakage reduction. Site safety improvements along the concrete walkway, including removal and replacement of existing pipe handrail with OSHA and IBCC compliant handrail system with safety gate. Extension of existing siphon pipe upstream of the sheet piling and existing water line along the walkway handrail for reinstallation or replacement in kind. Demolition of existing structures: pipe handrail, existing gate, stem, operator, and
Bid Close Date:
Lot 1: ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded The BASE BID Work shall include removal of existing low level drawdown system and installation of new reinforced concrete stop log guide walls including new sill and slots for new stop logs, and installation of a new low level drawdown system including new gate thimble, concrete overlay, and concrete operating platform. Leakage reduction items include installation of PZC- 18 metal sheet piling along the specified corridor and backfilling the area between sheet piling and upstream face of the dam. On the downstream face perform masonry joint repairs, masonry stone replacement, and tree removal to support leakage reduction. To improve site safety along the concrete walkway, remove and replace existing pipe handrail with OSHA and IBC- compliant handrail system with safety gate at the new gate operator. Existing siphon pipe is to be extended upstream of the sheet piling and existing water line along the walkway handrail for reinstallation or to be replaced in- kind. Demolition Work shall include full or partial demolition of the following existing structures: pipe handrail along the walkway, existing gate, stem, operator, and components. Localized chipping/demolition of the concrete slab near reported near the bottom of the existing gate may be required to accommodate installation of the new low level drawdown system. The CONTRACTORs Work shall also inc
RFB- 18- 27 Parks - Pennyrile Dam Repairs Study
Pennyrile Dam Repairs Study The base bid work shall include removal of existing low level drawdown system and installation of new reinforced concrete stop log guide walls including new sill and slots for new stop logs, and installation of a new low level drawdown system including new gate thimble, concrete overlay, and concrete operating platform. Leakage reduction items include installation of pzc18 metal sheet piling along the specified corridor and backfilling the area between sheet piling and upstream face of the dam. On the downstream face perform masonry joint repairs, masonry stone replacement, and tree removal to support leakage reduction. To improve site safety along the concrete walkway, remove and replace existing pipe handrail with OSH and IBCC compliant handrail system with safety gate at the new gate operator. Existing siphon pipe is to be extended upstream of the sheet piling and existing water line along the walkway handrail for reinstallation or to be replaced in kind. Demolition work shall i
Bid Close Date:
Lot 1: ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded The BASE BID Work shall include removal of existing low level drawdown system and installation of new reinforced concrete stop log guide walls including new sill and slots for new stop logs, and installation of a new low level drawdown system including new gate thimble, concrete overlay, and concrete operating platform. Leakage reduction items include installation of PZC- 18 metal sheet piling along the specified corridor and backfilling the area between sheet piling and upstream face of the dam. On the downstream face perform masonry joint repairs, masonry stone replacement, and tree removal to support leakage reduction. To improve site safety along the concrete walkway, remove and replace existing pipe handrail with OSHA and IBC- compliant handrail system with safety gate at the new gate operator. Existing siphon pipe is to be extended upstream of the sheet piling and existing water line along the walkway handrail for reinstallation or to be replaced in- kind. Demolition Work shall include full or partial demolition of the following existing structures: pipe handrail along the walkway, existing gate, stem, operator, and components. Localized chipping/demolition of the concrete slab near reported near the bottom of the existing gate may be required to accommodate installation of the new low level drawdown system. The CONTRACTORs Work shall also inc
**** - Justification and Approval - Thimble Shoal Additional Dredge Quantities - Sole Source Modification - **** Justification and Approval Thimble Shoal Additional Dredge Quantities Sole Source Modification
Add keywords for your products or services. Smart Search helps catch related opportunities beyond exact matches.
Use the 14-day free trial and get email alerts with documents or official posting links.
Adjust keywords, regions, email schedule and email style. Use map view and filters when you want to explore.
The idea of ​​using a keyword and sending the information by email is very good.
I closed deals thanks to the information gathered by the search tool. There’s no need to research across multiple media outlets.
The search engine that finds what I'm looking for just by entering keywords
You see a lot of tenders; you get emails with the alerts.
Excellent information. Just what I was looking for.
I consistently received notifications about bids within the specific segment I chose to monitor. The system simplifies processes that used to be complex, offering a navigation experience that is easy, fast, and modern.
Very good and very clear information.
It encompasses all portals in one place.
A very good platform.
The email alert is amazing. I really liked the speed — the bid notices arrive by keywords directly in my inbox, which makes searching much easier. I only need to focus on the other processes, which is a big relief.
It is complete and optimal, it improves my time.
I’ve used another platform before, and after discovering this one, I can see it’s much better. I find my bid opportunities faster, which speeds up my work.
The platform is very user-friendly.
Monitor opportunities across federal, state and local sources without checking them one by one.
Receive matching bids by email, then open documents or the official posting from one place.
Filter by region, method and value. Use favorites, notes and removals to keep only what matters.
Add what you sell, get scheduled alerts, open documents or the official page, and use filters by region and method.