Construction must be completed by September 18, 2020. The document states: completion date: september 18, 2020.
Bidders must submit at least five references for similar projects completed within the past two years. The document states: please submit at least five 5 references for similar projects completed within the past two 2 years.
Damage to existing trees results in a backcharge of $100 per caliper inch. The document states: any damage to an existing tree will result in a backcharge to the contract of 100 per caliper inch of the damaged tree.
Concrete samples are required. The document states: the contractor will be required to provide samples of all concrete used for this project. one test cylinder will be required from each truckload of concrete delivered to the site.
Failure to complete project references or subcontractor list will result in disqualification. The document states: failure to complete will result in disqualification of bid.