Town Of Highland Beach - FL
Lift Station No. 2 Rehabilitation - The work is described in general, non- inclusive below: 1. Civil Components: Elevation of wet well and valve vault, grading, vegetation removal, sodding, fence and gate removal and reinstallation, and site restoration. 2. Mechanical Components: Removal and replacement of the gate valves, check valves, and pump out connection within the existing valve vault. Installation of pipe supports. Removal and replacement of the pump guide rails to accommodate the new wet well heigh
Lift Station No. 2 Rehabilitation Civil components: elevation of wet well and valve vault, grading, vegetation removal, sodding, fence and gate removal and reinstallation, site restoration. Mechanical components: removal and replacement of gate valves, check valves, pump out connection, pipe supports, pump guide rails, access hatches with fall protection, bypass pumping system. Electrical components: removal and replacement of lift station control panel, termination boxes, equipment racks, grounding, level floats.
Bid Close Date: