This is a sources sought notice from the U. S. Army Contracting Command for the design, engineering, procurement, construction, and commissioning of a redundant 69 kv electrical power system for the Radford Army Ammunition Plant (RFAAP) in Radford, VA. The project includes a new interconnection point from an American Electric Power (AEP) transmission circuit, a new 69 kv transmission line, and a new 69 kv step-down substation within RFAAP. The substation must step down to **** kv and integrate with the existing RFAAP 69 kv electrical loop and SCADA system. All work must comply with applicable utility, federal, state, environmental, AT/OPSEC, and site-specific requirements. Construction is to be completed within 36 months of contract award. The government is seeking industry input regarding the acquisition strategy and may award a non-competitive, sole source contract. Technical Data Packages (TDPs), Statements of Work (SOWs), and Performance Work Statements (PWSs) are not currently available. Interested sources must submit capabilities qualification data demonstrating experience with turn-key design, environmental permitting, construction, and commissioning of high voltage 69 kv transmission lines and substations. Responses must be in PDF format, not exceeding 15 pages, with a minimum font size of 12 Calibri. The cover sheet must include company name, address, web URL, point of contact, telephone number, email address, Unique Entity Identifier (UEI), Commercial and Government Entity Code (CAGE), and business type/size based on NAICS codes **** and **** on technical approaches, scheduling, and risk mitigation strategies is also encouraged. Contractors must be registered in the System for Award Management (SAM). Submissions are due within 14 calendar days from the date of publication via email to Ms. Steffanie L. Adams and Ms. Anna E. Thissen. If the file size exceeds 5MB, respondents can request a drop-off via DoD SAFE. All inquiries must be made via email only. This notice is for information and planning purposes only and does not constitute a Request for Proposal (RFP).
The bid notice states that construction shall be completed within 36 months of contract award.
The government may utilize the information submitted in response to this sources sought notice to make a non-competitive, sole source contract award.
The government encourages all responsible interested sources to submit their capabilities qualification data, which demonstrates experience with the turn key design, environmental permitting, construction, and commissioning of high voltage 69 kv transmission lines and substations, specifically including the capability to establish a new interconnection point directly on an active, utility owned regional transmission grid.