07/09/2025 - USA | MD | JB ANDREWS
Synopsis Protective Coating and Marking Services - * Synopsis for Joint Base Andrews Protective Coating and Marking Services. All attachments are subject to change prior to soliciation. No response required as a result of this posting. All proposals shall be submitted upon posting of the official S
Statement of Work airfield pavement markings, rubber removal, protective coatings and signs joint base andrews, md 316 cesceoes contractor shall furnish all personnel, supervision, labor, equipment, tools, transportation, materials, supplies, quality control, management, appliances and other items and servicesto perform airfield rubber removal, striping of airfield, streets and parking lots, protective coating andsign maintenance on joint base andrews jba to include davidsonville site and brandywine site. thecontractor shall be responsible for, but not limited to, the following items of work: application of protective coatings to interior and exterior of base facilities, including attachments, i. e. fences etc. , and detached storage buildings. cleaning exterior surfaces of base facilities to remove soil, mold, mildew, fungus and other foreign matter in preparation for protective coatings. sandblasting facility surfaces, as applicable, to remove scale, rust, cracked and chipped paint, stains and other discolor
AI helper
The statement of work outlines the scope of work for airfield pavement markings, rubber removal, protective coatings, and sign maintenance at Joint Base Andrews, MD. The contractor is responsible for various tasks, including surface preparation, painting, patching, caulking, and sign fabrication. Payment will be made via task orders, including a list of work orders. The contractor must provide a project manager and designated alternates, and maintain a quality control plan. The government will provide office and warehouse space, utilities, and will account for possible work stoppages. Specific environmental and safety regulations must be followed, including spill containment and cleanup, asbestos handling, and hazardous waste disposal. Detailed measurement procedures and maximum performance times are included for different types of work. Additional documents, publications, and specifications are referenced.