City Of Norwich - CT
GREENEVILLE SANITARY SEWER REHABILITATION - The Work to be performed under this Contract includes, but is not limited to, constructing the Work described below and all appurtenances related to the Work. The Work shall be as follows: u2022 The Work includes cleaning and investigative closed- circuit television ( CCTV) inspection of approximately 540 linear feet of 24- inch brick pipeline and 230 linear feet of 27- inch brick pipeline not previously inspected. u2022 The Work includes approximately 11, 393 lin
Greeneville Sanitary Sewer Rehabilitation The work includes cleaning and investigative closed circuit television CCTV inspection of approximately 540 linear feet of 24 inch brick pipeline and 230 linear feet of 27 inch brick pipeline not previously inspected. The work includes approximately 11, 393 linear feet of cured in place pipe CIPP lined sanitary sewers ranging in diameter from 8 to 36 inch. The following CIPP liner insertion and curing methods shall be allowed for the pipeline diameter ranges included below: diameter inches allowable insertion curing method 8 through 16 air steam greater than 16 hydrostatic water. The work includes the application of geopolymer lining in 49 sanitary manholes, totaling approximately 404 vertical feet.
Bid Close Date: