Town Of South Windsor - CT
Reconstruction of Farnham Estates Phase I The full depth reconstruction of the Farnham Estates Neighborhood - Phase I. This includes the installation of new drainage pipe, catch basins and manholes, excavation and removal of existing pavement and base material down to the subgrade as shown on plans, installation of new processed aggregate base material, 2 lifts of new HMA pavement, bituminous curb, pavement markings, repaving driveway aprons, cutting, filling and grading of roadside slopes, and installing t
Bid Close Date: