City Of San Antonio
Eisenhauer â Northwood â Devonshire Ph 1A ( 2022 Bond) The scope ofthis project will include the following: install 10' x7' underground box culvert storm drain from end of previoustrunkline phase at Albin and Pike intersection to low water crossing. Additionally, the low water crossing will beraised with a new 7' x4' box culvert installed. The existing concrete channel will be demolished and the 7' x4' boxculvert storm drain will be installed in its place. Pike Rd, from approximately Albin to just past the
install 10 x7 underground box culvert storm drain install 10 x7 underground box culvert storm drain from end of previoustrunkline phase at albin and pike intersection to low water crossing. additionally, the low water crossing will beraised with a new 7 x4 box culvert installed. the existing concrete channel will be demolished and the 7 x4 boxculvert storm drain will be installed in its place. pike rd, from approximately albin to just past the low watercrossing, will be reconstructed with new storm sewer inlets, sidewalks and driveway approaches, with otherrelated items. saws water line and sewer line relocations will be included with the work. cps gas relocation isincluded also.
Bid Close Date: