Tulare Joint Union High School District
Tulare Union High School Gym Modernization - The scope of the project includes sand and resurface gym floors, design a gym floor striping pattern and graphics, remove and replace the bleachers, remove and replace existing evaporating cooling mechanical system and replace with a rooftop air handler with remote chilling, redesign and modernize boys restroom with vandal resistant finishes, add accessible stall to girls restroom and modernize finishes, replace door hardware at restrooms and utility rooms and up
Bid Close Date: